Building with help from family

| No Comments | No TrackBacks
Well we have had the fortune of Casey's father Bob coming to visit us from Fort Pierce FL. He is helping to assemble our house and what progress we have made, we now have all four walls!
We should have the the roof framed and sheathed by Sunday, our roof will have a 11 foot peak from the floor and a little more height from the ground. The house will have two foot overhangs all arrowed, this all equates to 300 square feet of roof space and that's good for water collection. Stay posted for more pictures and entries. january 067.jpgdecember 037.jpg

january 085.jpg

No TrackBacks

TrackBack URL: http://www.offgridintexas.com/cgi/mt/mt-tb.cgi/23

Leave a comment

About this Entry

This page contains a single entry by Sara published on January 14, 2010 8:30 PM.

Alpine was the previous entry in this blog.

Construction is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.