Well we have had the fortune of Casey's father Bob coming to visit us from Fort Pierce FL. He is helping to assemble our house and what progress we have made, we now have all four walls!
We should have the the roof framed and sheathed by Sunday, our roof will have a 11 foot peak from the floor and a little more height from the ground. The house will have two foot overhangs all arrowed, this all equates to 300 square feet of roof space and that's good for water collection. Stay posted for more pictures and entries.
We should have the the roof framed and sheathed by Sunday, our roof will have a 11 foot peak from the floor and a little more height from the ground. The house will have two foot overhangs all arrowed, this all equates to 300 square feet of roof space and that's good for water collection. Stay posted for more pictures and entries.

Leave a comment